2006 09 Kitchen Remodel

 

Home

Projects

2006 03 08 Kitchen, Before

2006 09 01 Cabinets in Progress

2006 09 05 Demolition Starts

2006 09 07 Demolition, Problems

2006 09 14 Vent and Posts Move I

2006 09 19 Vent and Posts Move II

2006 09 23 Floor Starts

2006 09 25 Cabinets in Progress

2006 09 25 Tile

2006 09 30 Tile, Structural

2006 10 07 Progress

2006 10 10 Cabinets in Progress

2006 10 12 Sheetrock

2006 10 16 Sheetrock, Lighting

2006 10 20 Paint, Cabinet Layout

2006 10 21 Cabinet Install Day 1

2006 10 22 Cabinet Install Day 2

2006 10 23 Cabinet Install Day 3

2006 10 26 Cabinets, Templates, Appliances

2006 10 31 Waiting

2006 11 22 In Use

2006 12 24 In Use

 

 

2006 10 07 Progress

There was not a whole lot of really big visible progress this week, but there was a lot of progress. The floor is completely done and covered, the structural work is done, and the electrical work is mostly done. The soffit for the exhaust for the new range has been started, and the exhaust to the outside on the west side of the kitchen is done.

The left side of the new range will be about where the center of the ladder is to the right of the hall in the above shots. I think the plan is to put the range hood on the wall before the cabinets are installed and before the painting is done. Next week - electrical work, lighting, sheetrock.